All kinds of pipes such as CPVC power pipe, MPP power pipe and PE power pipe are widely used in power transmission network. As a key accessory to ensure the stable operation of power pipelines, the installation sequence of power pipe pillows has a direct impact on the quality and safety of the entire project. Standardized and correct installation sequence can effectively avoid subsequent pipeline displacement and uneven stress, and ensure long-term stable operation of power pipelines.
The general order of installing pipe pillows in power pipelines is to place pipe pillows first, and then install power pipelines. This sequence seems simple, but it actually contains rigorous engineering logic. Before construction, construction personnel need to carefully study the engineering design drawings to clarify the spacing requirements for pipe pillow installation. Different pipe diameters and different types of power pipelines have different design standards for pipe pillow spacing. Taking the CPVC power pipe as an example, the small-diameter CPVC power pipe can be appropriately relaxed due to its light weight; while the large-diameter CPVC power pipe needs to shorten the pipe pillow spacing in order to ensure its stability. In actual operation, the construction personnel will use the measurement tool to accurately mark the placement position of the pipe pillow on the installation base surface according to the design requirements to ensure that the pipe pillow spacing error is controlled within the allowable range. After the
position marking is completed, the pipe pillow can be placed. During the placement process, it is necessary to ensure the stability and level of the pipe pillow to avoid tilting or uneven conditions, otherwise it will affect the overall stability of the power pipeline after installation. At the same time, the alignment between adjacent pipe pillows is also very critical. It is necessary to ensure that the pipe pillows are on the same straight line to lay a good foundation for the installation of subsequent power pipelines. Only when the pipe pillows are placed in a standard manner can the spacing between the power pipelines meet the design requirements, so that the power pipelines are evenly stressed during operation, and the risk of pipeline damage caused by improper spacing is reduced.
After the pipe pillows are placed in place, the next step is the installation of the power pipeline. Taking the MPP power pipe as an example, the MPP power pipe is carefully placed on the pipe pillow that has been placed. During the placement process, attention should be paid to avoid violent collisions between the pipeline and the pipe pillow to prevent damage to the surface of the pipeline. At the same time, ensure that the power pipeline is accurately positioned on the support part of the pipe pillow, so that the pipe pillow can fully play the role of support and fixation. For PE power pipes, it is also necessary to operate in strict accordance with the design requirements and installation specifications to ensure the accuracy of power pipeline installation.
looking for high-quality power pipes and pipe pillow products in Wuhan, Xiantao, Tianmen, Qianjiang, Jingmen and other places, Hubei AD Building Materials Co., Ltd. is a reliable choice. As a professional Hubei CPVC power pipe manufacturer and PE power pipe manufacturer, Hubei AD Building Materials Co., Ltd. has been deeply involved in the pipe field for many years. With advanced production equipment, mature production technology and strict quality control system, it provides the market with high-quality CPVC power pipes, MPP power pipes, PE power pipes and supporting power pipe pillow products. The company not only has excellent product quality, but also can provide customers with professional technical guidance and perfect after-sales services to help customers solve various problems in the installation process of power pipelines. If you have procurement or technical consultation needs, please call 17399989993, Hubei AD Building Materials Co., Ltd. will provide you with a full range of support and services.
follow the correct order of installing pipe pillows for power pipelines is an important prerequisite for ensuring the quality of power projects. Hubei AD Building Materials Co., Ltd. uses high-quality products and professional services to help power engineering construction in Wuhan, Xiantao, Tianmen, Qianjiang, Jingmen and other places, escorting the stable transmission of urban power.