Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manualthe1page

Double wall corrugated pipe construction manualthe2page

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 欧美砖区| 国产免费网 | "国产 精品" | 亚洲天堂视频免费在线观看 | 久久综合国产精品 | 一级黄色香蕉视频 | 五月婷网站 | 天堂va在线视频 | 最近最好最新2019中文字幕免费 | 激情自拍视频 | 精品国产一区二区三区噜噜噜 | 男人女人真曰批视频播放在线 | 综合久久91 | 天天草天天干天天射 | 亚洲精品88欧美一区二区 | 国产激情视频一区 | 亚洲精品不卡 | 日本一级特黄毛片高清视频 | 夜夜骑资源| 秋霞一区二区三区四区 | 老司机精品视频免费 | 欧美性猛交xxxx乱大交视频 | 水蜜桃视频在线观看免费 | 亚洲日韩国产二区无码 | 久久久久久久久久久蜜桃 | 中文字幕无硬高清在线 | 亚洲午夜精品A片一区二区三区 | 香蕉视频网站在线 | 国产精品自在自线 | 黄色片xx| 欧美日韩高清在线播放 | 一诺倾情免费观看国语 | 九色蝌蚪9l视频蝌蚪9l视频 | 久久综合九色综合欧美就去吻 | hdmaturetube日本成熟 | 国产精品天天看 | 免费xxxx视频 | 成人h动漫精品一区二区樱花 | 国产女人高潮抽搐喷水免费视频 | 人人干人人做 | 国自产偷精品不卡在线 |