Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manualthe1page

Double wall corrugated pipe construction manualthe2page

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 重口sm一区二区三区视频 | 国产精品欧美日韩在线 | 韩国日本免费观看 | 成人公开视频在线观看 | 一区二区三区不卡播放无码 | 日韩女人一级 | 爆乳放荡的女教师bd | 久久草在线视频国产 | 大地资源网在线 | 日本黄色片视频网站 | 国产在线观看免费 | 亚洲国产精品无码久久青草 | 亚洲成人综合在线 | 天天干天天色综合 | 免费视频在线观看网站 | 中文字幕精品一二三四五六七八 | 中文字幕亚洲高清 | 欧洲成人综合 | 成人av在线不卡 | 7799精品视频| 国精产品乱码视频一区二区 | 中文字幕的| "日日干 天天干" | 亚洲一级一级一级 | 一诺倾情免费观看国语 | 久久久久亚洲波多野结衣 | 天天舔天天操天天干 | 97成人啪啪网 | www.激情网.com| 88888888国产一区二区 | 柳州莫菁在线观看 | 亚洲欧美日韩色 | xxxxxxxxxx欧美| 久草资源网站 | 国精无码欧精品亚洲一区 | 久久精品国产精品亚洲精品 | 大号bbwassbigav头交 | 伊人色综合久久久天天蜜桃 | 中文字幕一本 | 七月婷婷久久 | 黄一区二区三区 |