红桃影视成人免费_中国按摩xxxx做受a_377人体裸体露私图片_久久亚洲AV永久无码精品_亚洲成国产人片在线观看_国产一a在一片一级在一片

How to connect HDPE double-wall corrugated pipe if it is broken?

2025-05-05

In municipal drainage, sewage and farmland irrigation projects, HDPE double-wall corrugated pipe has become an important pipeline material due to its advantages such as corrosion resistance and strong pressure resistance. However, due to external impact, long-term use aging and other factors, HDPE double-wall corrugated pipe may break. When encountering this problem, it is crucial to correctly connect and restore the normal use of the pipeline. Below, combined with the national standard of hdpe double-wall corrugated pipe and the experience of professional manufacturers, we will introduce the connection method of HDPE double-wall corrugated pipe after it is broken in detail. At the same time, we also recommend a reliable hdpe double-wall corrugated pipe manufacturer - Hubei Yuyuan Building Materials Co., Ltd., Tel: 17399989993.

heat shrinkable belt connection is a common and effective method to repair broken HDPE double-wall corrugated pipe. This method meets the relevant requirements of the national standard for hdpe double-wall corrugated pipe on pipeline connection, and can ensure the sealing and strength after connection. The specific operation steps are as follows:

Clean the fracture: First, use a clean rag, sandpaper and other tools to clean the fracture of HDPE double-wall corrugated pipe and its surrounding area of 20-30 cm. Remove burrs, oil, soil and other impurities at the fracture, and sand the surface of the pipe properly to increase the adhesion between the heat shrinkable belt and the pipe. The cleaning work must be meticulous, because any residual impurities may affect the connection effect and lead to problems such as loose sealing.

on the heat shrinkable belt: according to the diameter of the pipe, select the appropriate specification of the heat shrinkable belt, the heat shrinkable belt is pre-set on one of the pipes, and then align the two broken pipes. Make sure that the axis of the broken pipe is on the same straight line and the pipe diameter is consistent to avoid misalignment, otherwise it will affect the strength of the pipe and the flow of water after connection.

Heat shrinkage: use a heating spray gun for heating operation. Start from the middle position of the heat shrinkable belt and heat it evenly on both sides in a spiral manner. During the heating process, the distance between the spray gun and the surface of the heat shrinkable tape should be kept at about 10-15 cm, and the temperature should be controlled between 250-350 ° C. (For the specific temperature, please refer to the product manual or consult Hubei AD Building Materials Co., Ltd., Tel: 17399989993). With heating, the heat shrinkable tape will gradually shrink and fit tightly on the surface of the pipe. At the same time, the internal hot melt adhesive will melt and fill the gap between the pipe and the heat shrinkable tape to form a good sealing effect. When heating, pay attention to observe the shrinkage of the heat shrinkable tape to ensure that the heat shrinkable tape shrinks evenly without wrinkles, bubbles and other problems. When the heat shrinkable tape is completely contracted and tightly fitted to the pipe, stop heating and let it cool naturally.

when using the heat shrinkable belt to connect the broken HDPE double-wall corrugated pipe, there are some precautions to keep in mind. First, during the heating process, it is necessary to avoid local overheating or insufficient heating. Local overheating may cause the heat shrinkable belt to burn and damage, and insufficient heating cannot achieve good shrinkage and sealing effect. Second, during the cooling process of the heat shrinkable belt, do not touch or move the pipe at will to prevent the displacement of the connection part and affect the connection quality.

If you encounter complex problems during the connection process, or are not sure about the connection operation, it is recommended to contact a professional hdpe double-wall corrugated pipe manufacturer in time. As a professional Hubei PE pipe manufacturer, Hubei AD Building Materials Co., Ltd. produces AD PE double-wall corrugated pipes with reliable quality and has a professional technical team, which can provide customers with detailed technical guidance and solutions. Whether it is about the operation details of the heat shrinkable belt connection or other pipeline repair problems, you can call 17399989993 for consultation.

HDPE double-wall corrugated pipe after the broken connection needs to be operated in strict accordance with the specifications. The heat shrinkable belt connection method has become the first choice for many construction personnel due to its convenience and reliability. By following the national standard of HDPE double-wall corrugated pipe and combining the support of professional manufacturers, it can effectively ensure the repair quality of the broken pipeline and ensure that HDPE double-wall corrugated pipe continues to play a stable role in various projects.

How to connect HDPE double-wall corrugated pipe if it is broken?第1張

主站蜘蛛池模板: 99视频30精品视频在线观看 | 久久人体大尺寸大胆高清 | 性综合网 | 长江有色金属现货采购 | 天天操天天开心 | 国产精品午夜视频 | 7m在线视频7m精品视频 | 大秀福利网 | 花千骨在线观看 | 91人人爽久久涩噜噜噜 | 中国av资源免费在线 | 好男人www社区 | 日本大胆| 亚洲精品GV天堂无码男同 | 欧美黑人猛猛猛 | 色婷婷久久久swag精品 | 亚洲影视网| 中文字幕 亚洲精品 | 亚洲婷婷免费 | 制服丝袜国产在线无码 | 色图亚洲 | 日日碰狠狠躁久久 | 中国精品久久精品三级 | 加勒比在线 | 99热6这里只有精品 亚洲αⅴ无码乱码在线观看性色 | 五月天综合激情网 | 狠狠操夜夜 | 黄色网址在线免费观看 | 色综合久久88色综合天天人守婷 | 日韩欧美视频免费看 | 一区二区手机在线 | 中文字幕在线观看2019 | 被陌生人带去卫生间啪到腿软 | 国产日韩AⅤ无码一区二区三区 | JK制服爆乳裸体自慰流水免费 | 日本高清免费在线 | 天天干在线观看视频 | 偷拍区清纯另类丝袜美腿 | 亚洲人成岛国大片在线看欧美一区 | 日韩av线| 最近中文字幕完整视频高清 |