红桃影视成人免费_中国按摩xxxx做受a_377人体裸体露私图片_久久亚洲AV永久无码精品_亚洲成国产人片在线观看_国产一a在一片一级在一片

PE pipe acceptance, storage, handling and transportation, raw materials and connection technology

2025-03-21

PE pipe acceptance, storage, handling and transportation, raw materials and connection technologythe1page

1, General Provisions

① Pipes and fittings shall have the product quality inspection report of the quality inspection department and the certificate of conformity of the manufacturer.

② When storing, handling and transporting pipes, non-metallic ropes shall be used for bundling, and the ends of pipes shall be blocked.

③ When storing, handling and transporting pipes and fittings, they shall not be thrown and cracked.

④ When storing, handling and transporting pipes and fittings, they shall not be exposed to the sun and rain; they shall not be in contact with other chemical substances such as oil, acid and salt.

⑤ The storage period of pipes and fittings from production to use shall not exceed one year.

2, Material Acceptance

① Receiving pipes and fittings must be accepted. First accept the product instruction manual, product certificate, quality assurance and various performance inspection and acceptance reports and other relevant materials.

② When accepting pipes and pipe fittings, samples should be taken in the same batch, and according to the current national standard "Water supply (PE) polyethylene material" for specification size and appearance performance inspection, and comprehensive testing should be carried out when necessary.

3, storage

① Pipes and pipe fittings should be stored in a well-ventilated warehouse or a simple shed with a temperature not exceeding 40 ° C.

② Pipes should be stacked horizontally on a flat support or on the ground. The height of stacking should not exceed 1.5 meters. When the pipes are bundled into 1m x 1m square bundles and supported on both sides for protection, the stacking height can be appropriately increased, but it should not exceed 3m. The pipe fittings should be stacked neatly layer by layer, and should be ensured not to collapse, and easy to take and manage.

③ When the pipes and pipe fittings are temporarily stacked outdoors, there should be a cover.

④ When the pipes are stored, the pipes of different diameters and different wall thicknesses should be stacked separately.

4, handling

① When the pipes are transported, they must be hoisted with non-metallic ropes.

② When the pipes and pipe fittings are transported, they should be handled with care and arranged neatly. Do not throw and drag along the ground.

③ When handling pipes and pipe fittings in cold weather, severe impact is strictly prohibited.

5, transport

① When the vehicle transports the pipes, it should be placed on the bottom of the flat car, and when shipping, it should be placed in a flat cabin. During transportation, the whole length of the straight pipe should be supported, and the coils should be stacked neatly. Straight pipes and coils should be bundled and fixed to avoid colliding with each other, and stacking should not touch the sharp and convex objects that may damage the pipes.

② When the pipe fittings are transported, they should be stacked neatly and firmly in boxes.

③ Pipes and pipe fittings should be covered during transportation to avoid exposure to sun and rain.

PE pipe acceptance, storage, handling and transportation, raw materials and connection technologythe2page

ABS (acrylonitrile-butadiene-styrene copolymer)

Unplasticized polyvinyl chloride (UPVC)

CPVC (post-chlorinated polyvinyl chloride)

PP (polypropylene)

PE (polyethylene), also known as LDPE, MDPE and HDPE (low, medium, and high density)

6. Connecting technology

has developed to today, the connection technology of polyethylene has been very mature and reliable. Statistics show that the leakage rate of polyethylene pipe is less than 2/100,000, far lower than 2-3% of ductile iron pipe, AD pipe PE pipe, which greatly improves the safety and economic benefits of the pipeline, which is also a very important reason for the use of polyethylene pipe more gas pipelines.

PE pipe acceptance, storage, handling and transportation, raw materials and connection technologythe3page

Source: Hubei AD Building Materials Co., Ltd., welcome to share! Consultation Hotline: 17399989993



主站蜘蛛池模板: aa在线视频 | 亚洲精欧美一区二区精品 | 一二三在线视频 | 免费一级淫片aaa片毛片a级 | 在线资源天堂 | 日韩精品a在线观看 | 人妻少妇精品久久久久久 | 日日摸天天摸97狠狠婷婷 | 午夜嘿嘿嘿在线观看 | 国产天堂av | 伊人影视在线观看 | 明星angelababy造梦视频 | 天天爽夜夜爽人人爽曰 | 日韩在线首页 | 精品久久久久久久人人人人传媒 | 最新天堂资源在线 | 在线观看av的网站 | 国产人人艹 | 免费黄色美女视频 | 神马久久免费 | 高h喷水荡肉 | 每日在线观看av | 91最新在线 | 欧美一区网站 | 含羞草www国产在线视频 | 天天综合永久入口 | 国产1区2区3区4区 | 9久9久女女热精品视频在线观看 | 色噜噜狠狠一区二区三区狼国成人 | 一二三四在线免费观看 | 91观看在线视频 | 日韩尤物在线 | 伊人福利影院 | 夜夜视频 | 特级丰满少妇一级aaaa爰毛片 | 国产一区二区三区小向美奈子 | 亚洲成av在线 | 国产人人澡 | aⅴ 天堂免费 | 特级西西人体444WWw高清大胆 | 2024丁香五月天之婷婷综合缴情 |